Boeing Receives $1.5 Billion P-8A Poseidon Contract From U.S. Navy


Reading time ( words)

The U.S. Navy awarded Boeing a $1.5 billion production contract for the next 18 P-8A Poseidon aircraft. The contract includes eight aircraft for the U.S. Navy, six aircraft for the Republic of Korea Navy and four aircraft for the Royal New Zealand Air Force.

The Republic of Korea Navy and Royal New Zealand Air Force acquired the aircraft through the Foreign Military Sales process and will receive the same P-8A Poseidon variant designed and produced for the U.S. Navy. The Royal New Zealand Air Force is expected to begin receiving aircraft in 2022 and the Republic of Korea Navy is expected to begin receiving aircraft in 2023.

The P-8 is a proven long-range multi-mission maritime patrol aircraft capable of broad-area, maritime and littoral operations. A military derivative of the Boeing 737 Next-Generation airplane, the P-8 combines superior performance and reliability with an advanced mission system that ensures maximum interoperability in the battle space.

The P-8 is militarized with maritime weapons, a modern open mission system architecture and commercial-like support for affordability. The aircraft is modified to include a bomb bay and pylons for weapons. It has two weapons stations on each wing and can carry 129 sonobuoys. The aircraft is also fitted with an in-flight refueling system.

With more than 254,000 flight hours to date, the P-8A Poseidon and P-8I variants patrol the globe performing anti-submarine and anti-surface warfare; intelligence, surveillance and reconnaissance; humanitarian; and search and rescue missions.

Share

Print


Suggested Items

L3Harris Technologies Awarded $380 Million IDIQ Contract for WESCAM MX-Series

07/23/2020 | Business Wire
The Canadian Commercial Corporation (CCC) has awarded L3Harris Technologies an eight-year, $380 million indefinite delivery, indefinite quantity (IDIQ) contract to procure WESCAM MX-Series products and services in support of global U.S. Army surveillance and targeting operations.

Understanding MIL-PRF-31032, Part 1

07/07/2020 | Anaya Vardya, American Standard Circuits
Over the course of this series, Anaya Vardya will discuss topics such as MIL-PRF-31032 requirements, the quality plan, responsibilities of the Technical Review Board (TRB), and the testing and reporting requirements for the certified shop into the DLA.

What It Takes to Be a Milaero Supplier, Part 4

05/18/2020 | Anaya Vardya, American Standard Circuits
The decision to pursue military and aerospace (milaero) certification impacts every facet of the organization, and not every shop is prepared to make this transformation. This is the final article in a four-part series, breaking down what it takes. In Part 4, Anaya Vardya explores what it takes to be a milaero supplier in the area of manufacturing.



Copyright © 2020 I-Connect007. All rights reserved.