Knocking Down the Bone Pile: Electronics Assembly Industry Outlook

The next two to three years on the horizon should bring some challenges and opportunities for the electronics assembly industry. My perspective on the electronics supply chain is very broad in nature. Our firm is involved in PCB rework/repair, including the supply of niche PCB rework, repair, and assembly products, as well as the training of soldering technicians, engineers, and wire/cable harness users and suppliers.

In terms of markets, due to the very diverse nature of our business, we are involved in the military, aerospace, semiconductor, industrial, communications, EMS, IoT, computer, trade school, training center, education, research, and medical fields. The nature of our varied businesses and thousands of customers over 20+ years puts us in the mix from design through prototyping, manufacturing, and product support. Geographically, our products go directly into the market around the world, our rework and repair services are a harbinger of the EMS build market, and our training services are hyper-focused in the Midwest of the United States. Therefore, we see much of the activity in the global electronics supply chain. There are numerous PCB rework/repair challenges being faced by North American customers. One trend has to do with increasing package sizes, which are being driven by the market desires. In the past five years alone, the state-of-the-art semiconductor package has gone from approximately 10 to 30 billion transistors on a single package. These larger package devices—such as LGAs, BGAs, and CCGAs with greater than 50 x 50 mm overall package size—challenge rework equipment and processing capabilities.

To read this entire column, which appeared in the November 2019 issue of SMT007 Magazine, click here.

Back

2019

Knocking Down the Bone Pile: Electronics Assembly Industry Outlook

12-17-2019

Geographically, our products go directly into the market around the world, our rework and repair services are a harbinger of the EMS build market, and our training services are hyper-focused in the Midwest of the United States. Therefore, we see much of the activity in the global electronics supply chain. There are numerous PCB rework/repair challenges being faced by North American customers. One trend has to do with increasing package sizes, which are being driven by the market desires. In the past five years alone, the state-of-the-art semiconductor package has gone from approximately 10 to 30 billion transistors on a single package.

View Story

Knocking Down the Bone Pile: Process Methods for Reworking High Lead Count SMT Parts

10-09-2019

There are numerous methods for getting the solder onto the right pads in the right volume during SMT rework of high pin count or very small footprint SMT devices. The most common types of solder deposition include printing, dispensing, and hand soldering. Each of these methods has pros and cons, depending on a variety of factors in the rework process.

View Story

Knocking Down the Bone Pile: BGA and PCB Warpage—What to Do

07-10-2019

Warpage of BGA packages or PCBs can occur when any heating and subsequent cooling cycle is gone through. This may leave the package to bow in the middle. Pushing the corners up or downward will show up in bridging (caught on X-ray) or cause opens that would show up on endoscopic or visual inspection. Here's what you need to do.

View Story

Knocking Down the Bone Pile: Straightening Out Those Corners

05-22-2019

A PCB can be dropped, dinged, or mishandled as it is placed into a board carrier in the PCB assembly operations area. When the laminated material is damaged in this manner, can it be repaired? The answer, like most engineering answers, is that it depends. Read on.

View Story

Inspection of BGAs After Rework

03-21-2019

After removing and replacing a ball grid array (BGA), the acceptability of the interconnection of the solder balls to the PCB should be assured, because this assurance and the criteria for that assurance are the customer’s outgoing inspection criteria.

View Story

How Much is Too Much?

01-09-2019

One of the typical questions process engineers pose regarding the PCB rework process is, "How many heat cycles are too much?" Asked in another way, the question is, "How would one define a limit on the number of times a PCB can be reworked while still being reasonably assured that the reliability has not been impacted based on its operational environment?" Find out how.

View Story
Back

2018

Proper Thermal Shielding Yields Highest Rework Results

11-21-2018

There are numerous "gotchas" if the rework technician does not care for components and materials neighboring the component rework area. However, careful planning, shielding, and sometimes removing a neighboring device or material will ensure the highest possible rework yield.

View Story

Filling the Gap: Underfill Rework

09-21-2018

Rework technicians must take into account a variety of factors when considering whether or not to rework underfilled components, such as BGAs, CSPs, flip chips, and other component packages on handheld devices. But without a full understanding of the underfill characteristics, expect the outcome to be low yields unless the board was designed with reworkability in mind.

View Story

Replating of Gold Fingers: Getting the Shine Back

07-30-2018

There are several instances where the gold contacts on PCBs need to be replated, and IPC A-610 discusses several of these cases. This column by Bob Wettermann discusses gold replating of defective contacts caused by processes such as wave or selective soldering, or plating.

View Story

Masking of Conformal Coating During Assembly and Rework

06-11-2018

Masking of printed circuit boards post rework/repair as well as for initial PCB assembly is often required if the PCB is to be conformal coated. If a board that has conformal coating on it needs to be reworked or repaired, the conformal coating needs to first be removed before the operation of rework or repair can take place. This article centers around the various options for conformal coating masking via a liquid application process.

View Story

Device 'Dead Bugging'

04-20-2018

"Dead bug" attachment of electronic components is a way of building functioning electronic circuits by soldering the parts directly together or by soldering miniature jumper wires between the component leads and the PCB lands instead of the traditional surface mount or through-hole soldering of components onto a PCB.

View Story

PCB Pad Repair Techniques

01-08-2018

There are a variety of reasons behind pads getting "lifted" completely or partially from the laminate of a PCB. Per the just revised IPC-A-610 Revision G, a defect for all three classes occurs when the land is lifted up one or more pad thicknesses. Lifted pads can occur when a device has been improperly removed or there is a manufacturing defect in the board construction. In any case, as with any repair, the ultimate decision on the ability to repair the pad lies with the customer.

View Story
Copyright © 2020 I-Connect007. All rights reserved.