The 21st Century PCB Factory– Designed to Eliminate Offshore Cost Advantages


Reading time ( words)

Over 15 years have passed since North America and Europe ceased being the center of worldwide PCB fabrication and were supplanted by a Chinese market with low-cost labor, lax environmental requirements, and strong government support. In just a few short years, the superior offshore cost advantages of this new dynamic put volume PCB production in the West out of business, aside from the military and specialty technology applications contained in the few shops that continue to exist today.

Recently, however, the conditions that created the current equilibrium appear to be shifting again. In this new dynamic, automation, innovative green wastewater technologies, and next generation process equipment innovations have combined to make new factories capable of achieving rapid ROI for PCB fabrication almost anywhere in the world. This paper means to illustrate this new dynamic, and provide case study examples from the new greenfield installation at our captive facility in New Hampshire.

Read the full article here.


Editor's Note: This article originally appeared in the June 2016 issue of The PCB Magazine.

Share

Print


Suggested Items

Finding Process Improvement Opportunities in Training

02/25/2021 | Nolan Johnson, PCB007
Nolan Johnson speaks with Leo Lambert of EPTAC about training the next generation out of high school and vocational schools, and how his company continues to improve processes, grow and adapt to changing requirements while fulfilling its mission to deliver technical certification training.

Quality and Continuous Improvement

02/24/2021 | Patrick Valentine, UYEMURA USA
The concern for quality control and reduced product variation can be traced back centuries. Archaic quality control methods were used by the Xia Dynasty in 2100 BC in ancient China. During the late 1290s in medieval Europe, guilds—the pre-cursor to unions—were responsible for product and service quality. From 1700 to 1900, product quality was determined by the individual craftsman’s efforts. At the close of the 19th century, Eli Whitney introduced standardized, interchangeable parts to simplify assembly.

I-Connect007 Editor’s Choice: Five Must-Reads for the Week

02/19/2021 | Nolan Johnson, I-Connect007
I’m following the landing procedures for NASA’s Perseverance Mars lander as I’m finishing my Top 5 list for the week. The successful landing of the lander seems a nice highlight for this week. Our global aerospace programs, both national and private enterprise, make these missions seem almost, almost routine. They are, as we all know, anything but routine. No surprise, then, that aerospace-related news percolated to the top of mind for our readers this week.



Copyright © 2021 I-Connect007. All rights reserved.