Trilogy Circuits: Mil/Aero Demands Technological, Regulatory Expertise


Reading time ( words)

In the 16 years since its founding, Trilogy Circuits has become one of the go-to companies for mil/aero PCB design and manufacturing. I spoke with Charlie Capers, president and founder of the Richardson, Texas firm, about how he keeps ahead of the game. As he explains, succeeding with mil/aero PCB work requires not only mastery of the technological side, but of the regulations and certifications as well.

Andy Shaughnessy: Charlie, why don’t you start out with a little background on Trilogy Circuits. How much of your business today is military and aerospace?

Charlie Capers: Trilogy started as a PCB design service bureau in 2001 and then expanded into a full-service EMS company in 2004, specializing in military and government applications. Roughly 60–75% of our business is some type of government project.

Shaughnessy: I understand that your circuit boards end up in some pretty interesting military applications.

Capers: True. Some of our customers provide very vague descriptions of what a certain product does, while others will share more details. It helps us develop a more robust product if we have some idea about the operating conditions and environment the product will be used in. We design and manufacture some interesting systems for major players in the military and aerospace sector.

Shaughnessy: In our recent mil/aero survey, some people said that keeping up with changing regulations is one of the toughest parts of the job. What are we up to now? ITAR, NIST, AS9100…and a new AS9100 rev is coming.

Capers: This is one of the most complex areas when dealing with government contractors. ITAR registration with the State Department is a given these days and requires a lot of training and awareness when dealing with sensitive information. Compliance to a new cybersecurity mandate will be required by the end of 2017, which includes DFARS 252.204-7012 and NIST SP 800-171. These impose heightened security safeguards and mandatory reporting requirements and subcontractor flow-downs on DoD contractors handling Covered Defense Information (CDI). AS9100 Rev D is here, and any audits conducted after June 15, 2017 will have to be to the revision D standard. Revision D takes this registration to a whole new complexity level. Transition audits must be completed by September 15, 2018. Revision C certificates will become invalid after that date.

To read this entire interview, which appeared in the July 2017 issue of The PCB Design Magazine, click here.

Share

Print


Suggested Items

Bridging the Simulation Tool Divide

04/12/2021 | I-Connect007 Editorial Team
Todd Westerhoff of Siemens EDA recently spoke with the I-Connect007 Editorial Team about the divide between users of high-powered enterprise simulation tools and those who need a more practical tool for everyday use, and how Siemens is working to bridge the gap. Todd also shared his views on why so many engineers do not use simulation, as well as advice for engineers just getting started with simulation tools.

Barry Olney’s High-Speed Simulation Primer

04/09/2021 | Barry Olney, In-Circuit Design Pty Ltd
The I-Connect007 editorial team recently spoke with Barry Olney of iCD about simulation. Barry, a columnist for Design007 Magazine, explains why simulation tools can have such a steep learning curve, and why many design engineers are still not using simulation on complex high-speed designs.

Eliminating ‘Garbage In, Garbage Out’ With Checks and Balances

03/26/2021 | Nick Barbin, Optimum Design Associates
The proverbial saying “garbage in, garbage out” holds true in the electronic product development world. PCB designers stand squarely in the middle of a busy information intersection flowing with inputs and outputs. Missing or bad information at the beginning of a design project will undoubtedly lead to board re-spins, increased costs, and most importantly, a delayed product release. The same can be said about the PCB designer who doesn’t provide a fully checked and comprehensive data package to the downstream manufacturers, i.e., “throwing it over the fence.”



Copyright © 2021 I-Connect007. All rights reserved.